Construction of drainage channels, culverts and flood mitigation infrastructure to reduce seasonal flooding and protect residential communities within Sakumono.
System Status Feedback: Project execution timeline is within acceptable limits.
Real-time field telemetry and verified multi-node crowdsourced community media uploads.